CLIENT: Leo Pharma Project Team

PSDPLeopharma
Project Title: Construction of New Effluent Tank

Description: This project involved the excavation and construction of a new standby effluent tank together with duty/standby pump set and pipe work adjacent to the existing tank located at the south-west corner of the Leo Pharma property.

The work also involved the construction of manholes and polypropylene interconnecting gravity drainage pipelines together with valves. The electrical controls were wired back to the existing pump house.

The tank has two sections and involved an excavation in excess of 6.8M in length and 3.37M in depth, given the location of the tank and the adjacent live effluent tank a temporary works design was required for the excavation work to ensure the safety of all staff involved.

Construction Value: €250,000


Project Title: Refurbishment Works to Leo Pharma Warehouse Cork

Description: This project involved the conversion / reconfiguration of an existing open plan warehouse. The works involved the introduction of a number of partition walls to subdivide the work area into designated areas of work, work shops, storage, locker rooms and write up areas / meeting areas. Part of the store was made into a two-storey space with further storage at 1st floor level.

Construction Value: €250,000

Function on Projects: ASM acted as PSDP on both projects